What are the considerations for the loss of green space by the addition of the biofiltration basin which affects the unstructured recreational use for all citizens of Woodbury to walk, bike and frol

The trail system through the area provides a lot of opportunities for biking, walking and running and is not proposed to be removed. Mowed strip turf buffer areas are proposed along the existing trails, on top of the proposed basin as well as mowed turf along the property line to the townhomes north of the proposed basin.

Show All Answers

1. What are the legal contractual considerations altering existing green spaces and Markgrafs Lake?
2. Where is the documentation of all considered site options with pros and cons for each site?
3. Where are the actual plans for biofiltration basin site indicating size, depth and cross sections?
4. What types of plants are proposed for the basin?
5. What is the existing and proposed ground cover?
6. There are concerns of disrupting a turtle nesting area.
7. What are the plans for scheduled site maintenance and budgetary support?
8. What are the considerations for the loss of green space by the addition of the biofiltration basin which affects the unstructured recreational use for all citizens of Woodbury to walk, bike and frol
9. What is the project record?